Black Friday Sale EXTENDED!!! Spend $500 or more get FREE SHIPPING! Ends 12/15/24! Call or chat today! Large Project? Request a Quote.

Metallic Epoxy - Floor Kit - 600 to 675 sq ft - Super Thick 20 to 24mil Coating

This kit covers a 600 sq ft @ 24mils to 675 sq ft @22mils Floor - approximated 60 to 70 Sq Ft per gallon @ 24 mils thick! Includes 3 gallons of our superior waterborne primer HD-WB / 133 sq ft gallon @ 12 mils or 267 Sq Ft gallon @ 6 mils. This ...
  • $1,426.74

Customise your product

Available Options

This kit covers a 600 sq ft @ 24mils to 675 sq ft @22mils Floor - approximated 60 to 70 Sq Ft per gallon @ 24 mils thick! Includes 3 gallons of our superior waterborne primer HD-WB / 133 sq ft gallon @ 12 mils or 267 Sq Ft gallon @ 6 mils. 

This kit is marked on sale from $1728.74 to $1548.58! 

That's a $180.16 in savings! 

Wait a minute! Let's bring this kit down even further! 

From $1728.74, now down to $1,426.74! That's a $302 savings instantly!


What's Included:

• 3 Gallon Kit of Primer / Base (HDWB) - 8 - 10 mil coating 

• 9 Gallons of CLEAR100 (Metallic Binder - 100% Clear Epoxy) SUPER THICK 24 MIL COATING!

• 3 Containers (135 grams) of Metallic Pigment Powder - 1 - 12oz Jar for each 3 Gallon Kit of CLEAR100. Pick any 3 colors. 


Clear Coat (Urethane Top Coat) not included in price. 

Metallic Epoxy for car, truck or vehicle traffic should have a top coat (clear coat urethane). We have many urethanes to choose from, and if you have questions please feel free to ask one of our expert sales consultants. 


Our Metallic Epoxy kit is going to make any floor the highlight of your home or business. Installation support by a true trained professional comes with every kit we sell. Try to find that anywhere else! 

Surface prep is the most important part of your project. Tools not included in this kit.

* Metallic pigments are very light in weight, we sell them by volume. Meaning, 45 grams fits inside a 4oz container. To help our customer save money on shipping, in some cases we send you pouches or baggies of metallic pigment. You will still receive 135 grams of pigments for each color you choose in this kit. Total of 405 grams for this specific kit.


* Please note special order metallics may take 2 to 3 days longer than our standard colors. You can view our special order metallics here: https://www.spartanepoxies.com/metallic-pigments?product_id=105

Preparation, Mixing and Installation Instructions for Primer / Base - HD PRO High Solids System. This kit includes HD PRO, our superior and most versatile base system. 


1) PRODUCT STORAGE: Store product in an area so as to bring the material to normal room temperature before using. Continuous storage should be between 60 and 90 degrees F. Low temperatures or great temperature fluctuations may cause crystallization.


2) SURFACE PREPARATION: The most suitable surface preparation would be a fine brush blast (shot blast) to remove all laitance and provide a suitable profile. All dirt, foreign contaminants, oil, and laitance must be removed to assure a trouble free bond to the substrate. A test should be made to determine that the substrate (Concrete, Laminate, Tile, Formica, MDF, etc) is dry; this can be done by placing a 4’X4’ plastic sheet on the substrate and taping down the edges. If after 24 hours, the substrate is still dry below the plastic sheet, then the substrate is dry enough to start coating. The plastic sheet testing is also a good method to determine if any hydrostatic pressure problems exist that may later cause dis-bonding.


3) PRODUCT MIXING: This product has a mix ratio of 12# part A to 3.85# part B for standard colors. Standard packages are in pre-measured kits and should be mixed as supplied in the kit. We highly recommend that the kits not be broken down unless suitable weighing equipment is available. After the two parts are combined, mix well with slow speed mixing equipment such as a jiffy mixer until the material is thoroughly mixed and streak free. After mixing, transfer the mixed material to another pail (the transfer pail) and again remix. The material in the transfer pail is now ready to be applied on the primed substrate. Improper mixing may result in product failure.


4) PRIMING: This product is only intended as a high solids primer suitable for most substrates. However, if the surface is very porous, then a lower solids primer might be more suitable to reduce the possibility of air release problems occurring. Contact your Spartan Epoxies sales rep for more information.


5) PRODUCT APPLICATION: The mixed material can be applied by brush or roller. However, the material can also be applied by a suitable serrated squeegee and then back rolled as long as the appropriate thickness recommendations are maintained. Maintain temperatures and relative humidity within the recommended ranges during the application and curing process. If concrete conditions or over aggressive mixing causes air entrapment, then an air release roller tool should be used prior to the coating tacking o to remove the air entrapped in the coating. Thinner applications will not level as well as higher build applications.


6) RECOAT OR TOPCOATING: Although a topcoat is recommended, it is optional. Many topcoats are suitable for placement over this coating including both urethanes and epoxies. When top coating this product, you must first be sure that the coating has tacked o before top coating can commence. Before top coating, check the coating to verify no epoxy blushes were developed (a whitish, greasy film or de-glossing). If a blush is present, it must be removed prior to top coating. A standard type detergent cleaner can be used to remove any blush. Many epoxy coatings and urethanes are compatible for use as a topcoat for this product as well as multiple coats of this product as an intermediate build coat.


7) CLEANUP: Xylol is the most effective, but if you wish not to use xylol, you can use acetone or alcohol. Xylol is the best and most recommended. Remember to protect your skin and eyes.


8) CLEANING: Caution! Some cleaners may affect the color of the epoxy installed. Test each cleaner in a small area, utilizing your cleaning technique. If no ill effects are noted, you can continue to clean with the product and process tested.


9) RESTRICTIONS: Restrict the use of the surface to light traffic and non-harsh chemicals until the coating is fully cured (see technical data under full cure). It is best to let the floor remain dry for the full cure cycle. Dependent on actual complete system application, the surface may be slippery, especially when wet or contaminated; keep the surface clean and dry.

Preparation, Mixing and Installation Instructions for SPE-META-UV / 100% CLEAR EPOXY BINDER System. 


1.) PRODUCT STORAGE: Store product in an area so as to bring the material to normal room temperature before using. Continuous storage should be between 60 and 90 degrees F. Low temperatures or temperature fluctuations may cause crystallization.


2.) SURFACE PREPARATION: The most suitable surface preparation would be a fine brush blast (shot blast) to remove all laitance and provide a suitable profile. All dirt, foreign contaminants, oil, and laitance must be removed to assure a trouble free bond to the substrate. A test should be made to determine that the substrate (Concrete, Laminate, Tile, Formica, MDF, etc) is dry; this can be done by placing a 4’X4’ plastic sheet on the substrate and taping down the edges. If after 24 hours, the substrate is still dry below the plastic sheet, then the substrate is dry enough to start coating. The plastic sheet testing is also a good method to determine if any hydrostatic pressure problems exist that may later cause disbanding.


3.) PRODUCT MIXING: When mixing metallics take part B, open and pour into bucket, next open Metallic container and slowly pour into part B while mixing thoroughly. Make sure metallics achieve wetness. Once all metallics are mixed thoroughly add Part A and again mix thoroughly. To prevent air from being introduced into the epoxy, DO NOT lift mixing blade out of epoxy while mixing. This product has a mix ratio of 9.0# part A to 4.15# part B. Standard packages are in pre-measured kits and should be mixed as supplied in the kit. We highly recommend that the kits not be broken down unless suitable weighing equipment is available. After the two parts are combined, mix well with slow speed mixing equipment such as a jiffy mixer until the material is thoroughly mixed and streak free. After mixing, transfer the mixed material to another pail (the transfer pail) and again remix. The material in the transfer pail is now ready to be applied on the primed substrate. Improper mixing may result in product failure.


4.) PRIMING: A suitable primer should be used before applying this product. See the front side of this technical data for primer information. If a primer is not used, more porous substrates may cause outgassing and possible surface defects.


5.) PRODUCT APPLICATION: The mixed material can be applied by brush or roller. However, the material can also be applied by a suitable serrated squeegee and then back rolled as long as the appropriate thickness recommendations are maintained. Maintain temperatures and relative humidity within the recommended ranges during the application and curing process. If concrete conditions or over aggressive mixing causes air entrapment, then an air release roller tool should be used prior to the coating tacking off to remove the air entrapped in the coating. This product can be used with various colored sand in a broadcast system or other suitable aggregate can be used in conjunction with this product to achieve a variety of color and application patterns. When using as a broadcast binder, always evaluate performance parameters with a test area which is dependent on aggregate size and thickness, prior to application. Contact your representative for details as necessary.


6. RECOAT OR TOPCOATING: If you opt to recoat or topcoat this product, you must first be sure that the coating has tacked o before recoating. Always remember that colder temperatures will require more cure time for the product before recoating or top coating can commence. Before recoating or top coating, check the coating to ensure no epoxy blushes were developed (a whitish, greasy film or de-glossing). If a blush is present, it must be removed prior to top coating or recoating. Many epoxy coatings and urethanes are compatible for use as a topcoat for this product as well as multiple coats of this product.


7) CLEANUP: Use xylol.


8) CLEANING: Caution! Some cleaners may affect the color. Test each cleaner in a small area. If no ill effects are noted, you can continue to clean with the product and process tested.


9) RESTRICTIONS: Restrict the use of the epoxy to light traffic/use, and non-harsh chemicals until the coating is fully cured (see technical data under full cure). It is best to let the floor remain dry for the full cure cycle. Dependent on actual complete system application, the surface may be slippery, especially when wet or contaminated; keep the surface clean and dry.

  • 0%
  • 0%
  • 0%
  • 0%
  • 0%